Installation
2GR-FE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter with the 2 bolts.
Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)
(b) Connect the starter connector.
(c) Install the terminal nut and cover the nut with the cap.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
3. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
5. INSTALL INLET NO. 1 AIR CLEANER Installation
6. INSTALL BATTERY Installation
7. INSTALL INLET NO. 2 AIR CLEANER Installation
8. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
10. INSTALL COOL AIR INTAKE DUCT SEAL Installation