Intake Connection Assembly Overview
Intake Connection Assembly Overview
• When engine is switched off, the intake connection is closed for approximately 3 seconds and then opens again. This reduces the stop jolt.
• The components illustrated correspond to cylinder bank 1. They are a mirror image of the components for cylinder bank 2.
1 Intake connection with intake flap motor
Cylinder bank 1:
• Intake flap motor 1 (V157).
Cylinder bank 2:
• Intake flap motor 2 (V275).
2 8 Nm
3 Seal
• Replace.
• Before installing, check the sealing surfaces for contamination and clean if necessary.
4 Exhaust Gas Recirculation (EGR) vacuum regulator solenoid valve
• Checking mechanically, refer to --> [ Exhaust Gas Recirculation Valve Checking ] Testing and Inspection.
5 Intake manifold
• Removing and installing, refer to --> [ Intake Manifold ] Intake Manifold.
6 Gasket
• Replace.
• Note installation position.
7 20 Nm
8 From exhaust manifold
• --> [ (Item 2) Exhaust manifold ] Exhaust Manifold Assembly Overview.
9 Connecting pipe
10 Bracket
For connecting pipe --> [ (Item 9) Connecting pipe ].