Installation
2GR-FE INTAKE / EXHAUST: EXHAUST PIPE: INSTALLATION
1. INSTALL HEATED OXYGEN SENSOR (for Bank 2) Installation
2. INSTALL HEATED OXYGEN SENSOR (for Bank 1) Installation
3. INSTALL FRONT EXHAUST PIPE ASSEMBLY
(a) Install 2 new gaskets to the front exhaust pipe assembly.
(b) Connect the front exhaust pipe assembly to the No. 1 exhaust pipe support bracket (for Rear Side).
(c) Install the front exhaust pipe assembly with the 2 bolts and 2 nuts.
Torque : 55 Nm (561 kgf-cm, 40 ft-lbf)
(d) Connect the 2 heated oxygen sensor connectors.
(e) Install the 2 wire harnesses to the clamp.
4. INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET (for Front Side)
(a) Install the No. 1 exhaust pipe support bracket with the 2 nuts (for Front Side).
Torque : 33 Nm (337 kgf-cm, 24 ft-lbf)
5. INSTALL ENGINE UNDER COVER RH
6. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
7. INSTALL CENTER EXHAUST PIPE ASSEMBLY
(a) Install a new gasket to the front exhaust pipe assembly.
(b) Connect the center exhaust pipe assembly to the exhaust pipe supports.
(c) Install the center exhaust pipe assembly with the 2 bolts and 2 nuts.
Torque : 49 Nm (500 kgf-cm, 36 ft-lbf)
8. INSTALL EXHAUST PIPE DAMPER
(a) Install the exhaust pipe damper with the 2 bolts.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
9. INSTALL TAIL EXHAUST PIPE ASSEMBLY
(a) Install a new gasket to the center exhaust pipe assembly.
(b) Connect the tail exhaust pipe assembly to the 3 exhaust pipe supports.
(c) Install the tail exhaust pipe assembly with the 2 nuts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
10. INSTALL TAIL EXHAUST PIPE ASSEMBLY LH
(a) Install a new gasket to the center exhaust pipe assembly.
(b) Connect the tail exhaust pipe assembly LH to the 2 exhaust pipe supports.
(c) Install the tail exhaust pipe assembly LH with the 2 nuts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
11. INSPECT FOR EXHAUST GAS LEAK