Curiosii for ever!: Car repair manuals for everyone.

Valve Body: Testing and Inspection





U340E AUTOMATIC TRANSAXLE: VALVE BODY ASSEMBLY: INSPECTION

1. INSPECT SHIFT SOLENOID VALVE S1





(a) Measure the resistance.

Standard resistance:





(b) Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the operation of the valve.

NOTICE:
While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

OK:

The solenoid makes an operating sound.

2. INSPECT SHIFT SOLENOID VALVE S2





(a) Measure the resistance.

Standard resistance:





(b) Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the operation of the valve.

NOTICE:
While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

OK:

The solenoid makes an operating sound.

3. INSPECT SHIFT SOLENOID VALVE ST





(a) Measure the resistance.

Standard resistance:





(b) Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the operation of the valve.

NOTICE:
While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

OK:

The solenoid makes an operating sound.

4. INSPECT SHIFT SOLENOID VALVE SLT





(a) Measure the resistance.

Standard resistance:





(b) Connect the positive (+) battery lead with a 21 W bulb to terminal 2 and the negative (-) battery lead to terminal 1 of the solenoid valve connector, and check the operation of the valve.

NOTICE:
While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

OK:

The solenoid makes an operating sound.

5. INSPECT SHIFT SOLENOID VALVE SLU





(a) Measure the resistance.

Standard resistance:





(b) Connect the positive (+) battery lead with a 21 W bulb to terminal 2 and the negative (-) battery lead to terminal 1 of the solenoid valve connector, and check the operation of the valve.

NOTICE:
While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

OK:

The solenoid makes an operating sound.