Curiosii for ever!: Car repair manuals for everyone.

Installation





1NZ-FE CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY





(a) Provisionally install the generator with fixing bolt B.

(b) Provisionally install the fan belt adjusting slider with fan belt adjusting slider fixing bolts A and B, then move the generator toward the cylinder block and tighten bolt B.





Torque : 11 Nm (112 kgf-cm, 8.1 ft-lbf)

(c) Install the connector and the wire harness clamp.





(d) Install terminal B with the nut.

Torque : 9.8 Nm (100 kgf-cm, 7.2 ft-lbf)

(e) Install the terminal cap.

2. INSTALL FAN & GENERATOR V BELT Installation

3. ADJUST FAN & GENERATOR V BELT Installation

4. INSPECT FAN & GENERATOR V BELT Installation

5. INSTALL ENGINE UNDER COVER RH

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)