Installation
2ZR-FXE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY
(a) Install the vacuum switching valve assembly with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Connect the 2 fuel vapor feed hoses and connector to the vacuum switching valve assembly.
(c) Connect the No. 1 vacuum switching valve connector.
2. INSTALL AIR CLEANER CASE Installation
3. INSTALL INLET AIR CLEANER ASSEMBLY Installation
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
5. INSTALL NO. 2 CYLINDER HEAD COVER Installation