Installation
2ZR-FXE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY
(a) Install a new gasket on the water inlet with thermostat sub-assembly.
(b) Install the water inlet with thermostat sub-assembly with the 2 nuts and bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Connect the No. 2 radiator hose and No. 3 water by-pass hose.
2. ADD ENGINE COOLANT (for Engine) Service and Repair
3. INSPECT FOR COOLANT LEAK (for Engine) Cooling System
4. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE SUB-ASSEMBLY Installation
5. INSTALL INLET AIR CLEANER ASSEMBLY Installation
6. INSTALL NO. 1 ENGINE UNDER COVER