Installation
1UR-FE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL WATER INLET SUB-ASSEMBLY WITH THERMOSTAT
(a) Install a new gasket and the water inlet with thermostat with the 3 nuts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
2. CONNECT NO. 2 RADIATOR HOSE Installation
3. INSTALL AIR TUBE SUB-ASSEMBLY Installation
4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
5. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
6. INSTALL AIR CLEANER CAP AND HOSE Installation
7. ADD ENGINE COOLANT Service and Repair
8. INSPECT FOR COOLANT LEAK Testing and Inspection
9. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
10. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY Installation
11. INSTALL LOWER FRONT BUMPER COVER Installation
12. INSTALL UPPER RADIATOR SUPPORT SEAL Installation