Left Coolant Pipes
Left Coolant Pipes
Special tools, testers and auxiliary items required
• Drip Tray for Workshop Crane (VAS 6208)
• Hose Clamp Pliers (VAS 6362)
Removing
- Pull front engine cover off - arrows -.
• Before removing the ribbed belt, mark the turning direction on it with chalk or a felt tip pen. A reversed turning direction can cause damage to the belt under operating conditions.
- Pivot tensioning device in direction of - arrow - to relieve tension on ribbed belt.
- Remove ribbed belt from the coolant pump.
- Release tensioner unit
CAUTION!
Cover cap of expansion tank with rag and open carefully, as hot steam for example hot coolant may escape when opening.
- Open cap of coolant expansion tank.
- Remove noise insulation.
- Place Drip Tray for Workshop Crane (VAS 6208) under engine.
- Disconnect coolant hose - arrow - from oil cooler and drain coolant.
- Separate connector - 1 - for wiring to air conditioning compressor clutch solenoid.
CAUTION!
The air conditioning refrigerant circuit must not be opened.
- Remove air conditioning compressor from bracket - arrows -.
• To prevent damage to the refrigerant lines/hoses, ensure that the lines and hoses are not stretched, kinked or bent.
- Hang up the air conditioning compressor with attached lines on left side of vehicle.
- Remove bolts - arrows - and remove air conditioning compressor bracket.
- Remove the bolts - arrows -.
- Disconnect coolant pipes from coolant hoses - 1 - and - 2 -.
• To improve clarity, the power steering pump is shown removed.
Installing
Installation is in reverse order of removal, note the following:
• Replace O-rings.
• Secure all hose connections with hose clamps appropriate for the model.
- Clean and/or smooth O-ring sealing surface before installing.
- Coat a new O-ring with coolant and slide it onto the coolant pipe.
- Install A/C compressor.
- Install ribbed belt. Ribbed belt=> [ Ribbed Belt ] Ribbed Belt.
- Fill with coolant => [ Filling ] Procedures.
Tightening Specifications