Radiator Assembly Overview
Radiator Assembly Overview
1 Coolant line
• With connection for Engine Coolant Temperature (ECT) sensor (on radiator) (G83)
2 Radiator
• Removing and installing, refer to --> [ Radiator ] Radiator.
• After replacing, replace entire amount of coolant.
3 Condenser
4 Oil cooler
• For transmission oil.
5 Oil cooler
• For power steering fluid.
6 Lock carrier
7 Bolt, 10 Nm
8 Low temperature cooler
• For fuel cooling.
• Only with certain equipment options.
9 Bolt, 10 Nm
10 Rubber bushing
• For lock carrier.
11 Retaining clip
• Check for secure seating.
12 Rubber bushing
13 Lower coolant hose
• Secured to radiator with a quick connect coupling.
• Ensure seated tightly.
14 To right coolant pipe
• Installed on cylinder head bank 1.
15 To coolant pump
ECT Sensor (on radiator) (G83) Component Location
The ECT sensor (on radiator) (G83) - 1 - is installed on the upper coolant hose connection - 2 -.