Air Injection Check Valve: Testing and Inspection
REQUIREMENTS- Hand Vacuum Pump US 8026 or equivalent.
- Auxiliary hose to fit the inlet on the Air Injection Check Valve.
TEST PROCEDURE
- Remove pressure hose from the inlet on the Air Injection Check Valve.
- Pull vacuum hose off Air Control Solenoid valve.
- Connect hand vacuum pump to vacuum hose to Air Injection Check Valve.
Note: Do not use compressed air during the following check!
- Connect auxiliary hose to connection for pressure hose and blow into it.
- Air Injection Check Valve must be closed. NO air can be blown through it.
- Operate hand vacuum pump.
- Air Injection Check Valve must open. Air must easily be blown through it.