Installation
2ZR-FXE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly with the 3 bolts and clip.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Connect the air inlet line tube, connector, tube clamp and wire harness clamp.
(c) Connect the vent line tube.
(1) Connect the pipe to the fuel tube connector, as shown in A in the illustration. Then push up the retainer to lock the claws, as shown in B in the illustration.
NOTICE:
* Check that there are no scratches or foreign matter around the connected parts of the vent line tube connector and pipe before performing this work.
* After connecting the vent line tube, check that the vent line tube is securely connected by pulling the vent line tube connector and pipe.
(d) Connect the purge line hose and tube clamp.
2. INSTALL REAR FLOOR STEP UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover)
(a) Connect the 3 clips (B).
(b) Install the rear floor step under cover sub-assembly with the nut and 5 clips (A).
3. CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL
4. INSTALL REAR NO. 3 FLOOR BOARD Installation
5. INSTALL REAR DECK FLOOR BOX Installation
6. INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) Installation