Installation
FRONT SUSPENSION: FRONT LOWER SUSPENSION ARM (for 2GR-FE): INSTALLATION
HINT
* Use the same procedure for the RH side and LH side.
* The procedure listed below is for the LH side.
1. INSTALL FRONT LOWER NO. 1 SUSPENSION ARM SUB-ASSEMBLY
(a) Install the front lower arm bushing stopper to the front lower No. 1 suspension arm sub-assembly.
(b) Install the front lower No. 1 suspension arm sub-assembly to the front frame assembly with the 3 bolts and nut in the order shown in the illustration.
Bolt 1, 2 - Torque : 200 Nm (2039 kgf-cm, 148 ft-lbf)
Bolt 3 - Torque : 135 Nm (1377 kgf-cm, 100 ft-lbf)
NOTICE:
While keeping the nut from rotating, tighten the bolt.
2. INSTALL ENGINE MOUNTING INSULATOR Installation
3. INSTALL FRONT FRAME ASSEMBLY
Installation