Curiosii for ever!: Car repair manuals for everyone.

Installation






2GR-FE EMISSION CONTROL: PURGE VALVE (for EVAP): INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE

(a) Install the No. 1 vacuum switching valve with the bolt.





Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)

(b) Connect the 2 vacuum hoses and No. 1 vacuum switching valve connector.





2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation