Curiosii for ever!: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All
Both Banks16.711.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Note
With AC, Add0.20.1A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew7.80.0A
Crankshaft, Renew7.80.0A
Oil Pump, Renew2.60.0A
Oil Pump Screen, Clean0.20.0A
Timing Belt, Renew1.00.0A
Tune Up0.60.0A