Main Converter
REMOVAL:1. Disconnect negative battery cable.
2. Remove engine under covers.
3. Remove No. 1 and No. 2 intake connectors.
4. Remove tailpipe.
5. Remove front exhaust pipe.
6. Remove idler pulley bracket and A/C compressor without disconnecting hoses.
RH Converter Stay:
7. Remove four bolts and RH converter stay.
LH Converter Stay:
8. Remove three bolts and LH converter stay.
Converter Removal And Installation:
9. Remove three bolts, two nuts, converter, gasket, retainer and cushion.
Converter Heat Insulators:
10. Remove nine bolts and two heat insulators from converter.
INSTALLATION:
Converter Heat Insulators:
1. Install two heat insulators to new converter with nine bolts.
Gasket, Retainer And Cushion Assembly:
2. Place cushion, retainer and a new gasket on converter.
3. Install converter with the three bolts and two new nuts.
Torque Value: 21 ft.lb (29 Nm)
RH Converter Stay:
4. Install RH converter stay with four bolts.
Torque Value: 43 ft.lb (59 Nm)
LH Converter Stay:
5. Install LH converter stay with three bolts.
Torque Value: 43 ft.lb (59 Nm)
6. Install idler pulley bracket and A/C compressor without disconnecting hoses.
7. Install front exhaust pipe
8. Install tailpipe, No. 1 and No. 2 air intake connectors.
9. Install engine under covers.
10. Connect negative battery terminal.