III. SSC Completion Label Installation Procedure
1. After completing replacement of the EBCV and before returning the vehicle to the owner, a SSC completion label that is enclosed in the owner's letter must be affixed to the firewall, make sure that the surface is clean and dry to ensure proper adhesion of the label.
2. The label is to be filled out as illustrated.
3. Additional SSC completion labels, in sheets of 50 (P/N 00410-01917), may be ordered through the non-parts system on a 1450 order form or through-the TDN system.