Shift Solenoid: Testing and Inspection
INSPECT SOLENOID.a. Disconnect the connector from the ECT computer.
b. Measure the resistance between S1 , S2 , SL and ground.
STD: 11-15 ohms.
c. Apply battery voltage to the solenoid. Check that an operation noise can be heard from the solenoid.
NOTE: If there is foreign material in the solenoid valve, there will be no fluid control even with solenoid operation.