Curiosii for ever!
: Car repair manuals for everyone.
Home
>>
Toyota Truck
>>
2008
>>
Sequoia 2WD V8-4.7L (2UZ-FE)
>>
Repair and Diagnosis
>>
Powertrain Management
>>
Emission Control Systems
>>
Evaporative Emissions System
>>
Canister Purge Control Valve
>>
Service and Repair
>>
Installation
Installation
2UZ-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
INSTALLATION
1.
INSTALL PURGE VSV
(a)
Install the purge VSV with the bolt.
Torque: 18 Nm (184 kgf-cm, 13 ft-lbf)
(b)
Connect the 2 purge line hoses.
(c)
Connect the purge VSV connector.