Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | 8.0 | 5.9 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigauge Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Crankshaft | ||||
| Manual Trans | 4.4 | 0.0 | A | |
| Auto Trans | 4.8 | 0.0 | A | |
| Main Bearings | ||||
| Manual Trans | 4.4 | 0.0 | A | |
| Auto Trans | 4.8 | 0.0 | A | |
| Oil Pump | 1.8 | 0.0 | A | |
| Timing Belt | 1.0 | 0.0 | A | |
| Tune-Up | 0.4 | 0.0 | A | |
| NOTE | ||||
| With AC, Add | 0.8 | 0.5 | A |