| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Complete Assembly Without Transfer Of Parts | 12.7 | 0.0 | B | Does Not Include: Transfer Of Any Part Or Engine Or Replacement Of Optional Equipment. |
| Complete Assembly With Transfer Of Parts | 15.2 | 0.0 | B | Includes: Transfer All Fuel & Electrical Units. Does Not Include: Transfer Of Optional Equipment. |
| Short Block | 22.2 | 0.0 | A | Includes: R&I Engine And Transfer All Necessary Components. |
| NOTE |
| To Grind Valves, Add |
| Right Bank | 2.9 | 0.0 | A | |
| Left Bank | 2.8 | 0.0 | A | |
| Both Banks | 5.6 | 0.0 | A | |
| Long Block | 19.2 | 0.0 | B | Includes: R&I Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| Overhaul/Rebuild | 32.2 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Inspect & Replace All Necessary Components, R&I Engine, Grind Valves & Tune-Up. |