| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind |
| Right Bank |
| Without Turbo | 12.5 | 8.5 | A | After Engine Is Removed. Includes: R&R Cylinder Heads And Make All Necessary Adjustments. |
| With Turbo | 18.1 | 14.1 | A | After Engine Is Removed. Includes: R&R Cylinder Heads And Make All Necessary Adjustments. |
| Left Bank |
| Without Turbo | 12.5 | 8.5 | A | After Engine Is Removed. Includes: R&R Cylinder Heads And Make All Necessary Adjustments. |
| With Turbo | 19.4 | 15.4 | A | After Engine Is Removed. Includes: R&R Cylinder Heads And Make All Necessary Adjustments. |
| Add the Following Operations If Performed With Valves, Grind |
| Valve Guides, Knurl |
| Each | 0.2 | 0.0 | A | |
| Valve Guides, Renew |
| Each Bank | 1.2 | 0.0 | A | |
| Note |
| To Ream Guide, Add | 0.2 | 0.0 | A | |
| Rocker Shaft ASSY, Overhaul |
| Each Bank | 0.5 | 0.0 | A | |
| Timing Chain, Renew |
| Without Turbo | 0.8 | 0.0 | A | |
| With Turbo | 1.5 | 0.0 | A | |
| Tune-Up | 0.6 | 0.0 | A | |
| Head Removed |
| One Head | 1.2 | 0.7 | A | |
| One Bank | 3.0 | 2.0 | A | |
| Both Banks | 6.0 | 4.0 | A | |