| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Each Additional | 0.7 | 0.4 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |
| One CYL | 8.8 | 6.5 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |
| All Cyls | 10.8 | 7.6 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |
| Note |
| With AC, Add | 0.4 | 0.2 | A | |
| To Grind Valves, Add | 2.2 | 1.6 | A | |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.3 | 0.0 | A | |
| Oil Pump, Renew | 1.6 | 0.0 | A | |
| Tune-Up | 0.5 | 0.0 | A | |
| Crankshaft, Renew | 3.5 | 0.0 | A | |
| Timing Belt, Renew | 0.7 | 0.0 | A | |