| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew |
| Each | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew | 3.3 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump, Renew | 0.9 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Chain & Gears, Renew | 1.0 | 0.0 | A | Does Not Include: R&R Engine. |
| Tune-Up | 0.6 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| One Cylinder |
| Right Bank | 8.5 | 6.1 | A | Includes: R&R Cylinder Head & Oil Pan. |
| Left Bank | 7.4 | 5.3 | A | Includes: R&R Cylinder Head & Oil Pan. |
| Both Banks | 11.6 | 8.3 | A | Includes: R&R Cylinder Head & Oil Pan. |
| All Cylinders | 15.4 | 11.0 | A | Includes: R&R Cylinder Head & Oil Pan. |