| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.7 | 0.0 | A | Add The Following Operations If Performed Along With Piston & Ring Operations. |
| Crankshaft, Renew | 3.7 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump, Renew | 1.4 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine. |
| Rear Main Seal, Renew |
| Manual Trans | 3.1 | 0.0 | A | Does Not Include: R&R Engine. |
| Auto Trans | 3.0 | 0.0 | A | Does Not Include: R&R Engine. |
| Timing Chain, Renew | 2.2 | 0.0 | A | Does Not Include: R&R Engine. |
| Tune-Up | 0.6 | 0.0 | A | See Valves, Grind Head Removed And Combinations. 5.6 |
| One Cylinder |
| Right Bank | 11.9 | 7.9 | A | Includes: R&R Cylinder Head, Oil Pan And Plastigage Bearings. |
| Left Bank | 11.9 | 7.9 | A | Includes: R&R Cylinder Head, Oil Pan And Plastigage Bearings. |
| Both Banks | 14.4 | 9.4 | A | Includes: R&R Cylinder Head, Oil Pan And Plastigage Bearings. |
| All Cylinders |
| Right Bank | 13.4 | 9.4 | A | Includes: R&R Cylinder Head, Oil Pan And Plastigage Bearings. |
| Left Bank | 13.4 | 9.4 | A | Includes: R&R Cylinder Head, Oil Pan And Plastigage Bearings. |
| Both Banks | 20.3 | 12.3 | A | Includes: R&R Cylinder Head, Oil Pan And Plastigage Bearings. |