| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One CYL |
| Right Bank | 16.0 | 10.6 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Left Bank | 15.7 | 9.1 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Both Banks | 19.4 | 12.4 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Each Additional | 0.8 | 0.5 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Note |
| To Renew Connecting Rod Bearing, Add |
| Each | 0.1 | 0.0 | B | |
| To Renew Piston, Pin or Connecting Rod, Add |
| One | 0.2 | 0.0 | B | |
| Each Additional | 0.1 | 0.0 | B | |
| All | 0.7 | 0.0 | B | |
| With Locking Wheel Covers/Lug Nuts, Add | 0.1 | 0.1 | B | |
| To Grind Valves, Add | 2.3 | 0.0 | B | |
| Tune-Up, Add | 0.7 | 0.0 | B | |
| All Cyls | 21.3 | 14.3 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |