Curiosii for ever!: Car repair manuals for everyone.

A/C - Installation Procedure for Turbodiesel: Overview

84peugeot02

Bulletin No. 130


Date: December, 1983
Subject: AIR CONDITIONING INSTALLATION ON 505 XD2S TURBODIESEL GL SEDAN AND STATION WAGON


Attached herewith you will find the procedure for installing the only authorized factory air conditioning on GL models.


The Repair Time Schedule operation to be used is:

15.191.0 INSTALL AIR CONDITIONING 2.5 HRS.

Including:

13.435.0 Evacuate and Recharge AC


Refer to Warranty Bulletin for specific warranty registration procedures.