A/C - Installation Procedure for Turbodiesel: Overview
84peugeot02Bulletin No. 130
Date: December, 1983
Subject: AIR CONDITIONING INSTALLATION ON 505 XD2S TURBODIESEL GL SEDAN AND STATION WAGON
Attached herewith you will find the procedure for installing the only authorized factory air conditioning on GL models.
The Repair Time Schedule operation to be used is:
15.191.0 INSTALL AIR CONDITIONING 2.5 HRS.
Including:
13.435.0 Evacuate and Recharge AC
Refer to Warranty Bulletin for specific warranty registration procedures.