100. Water Crossover Installation
1. Place the water crossover and gaskets in position.
2. Connect the coolant feed tube (1) to the throttle body.
Notice: Refer to Fastener Notice in Service Precautions.
3. Install the water crossover bolts (1-6).
Tighten the water crossover bolts in sequence (1-6) to 25 Nm (18 ft. lbs.).