Crankshaft: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | 12.7 | 9.3 | A | Includes: R&R Engine. |
| Note | ||||
| To R&R Cylinder Head, Add | ||||
| One Bank | 3.2 | 2.3 | A | |
| Both Banks | 4.3 | 3.1 | A | |
| To Replace Piston Rings, Add | ||||
| One Cylinder | 0.7 | 0.4 | A | |
| All Cylinders | 2.8 | 2.0 | A | |
| To Replace Connecting Rod, Add | ||||
| One Cylinder | 0.5 | 0.3 | A | |
| All Cylinders | 2.0 | 1.4 | A | |
| With AC, Add | 1.0 | 0.7 | A | |
| With Locking Wheel Covers, Add | 0.2 | 0.1 | A | |
| With Locking Lug Nuts, Add | 0.2 | 0.1 | A | |
| To Replace Piston, Add | ||||
| One Cylinder | 0.9 | 0.6 | A | |
| All Cylinders | 4.5 | 3.2 | A |