| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One Cylinder |
| Right Bank | 11.3 | 8.3 | A | Includes R&R Oil Pan & Cylinder Head |
| Left Bank | 11.1 | 8.1 | A | Includes R&R Oil Pan & Cylinder Head |
| Both Banks | 13.5 | 10.5 | A | Includes R&R Oil Pan & Cylinder Head |
| All Cylinders |
| Right Bank | 12.8 | 9.8 | A | Includes R&R Oil Pan & Cylinder Head |
| Left Bank | 12.6 | 9.6 | A | Includes R&R Oil Pan & Cylinder Head |
| Both Banks | 18.3 | 13.3 | A | Includes R&R Oil Pan & Cylinder Head |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew | 4.2 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump, Renew | 1.4 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine. |
| Rear Main Oil Seal, Renew | 1.5 | 0.0 | A | Does Not Include: R&R Engine. |
| Timing Chain, Renew | 1.2 | 0.0 | A | Does Not Include: R&R Engine. |
| Valves, Grind |
| See Valves Grind Head Removed & Combinations. |