Curiosii for ever!: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Without Turbo13.79.8AIncludes: R&I Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
With Turbo15.711.0AIncludes: R&I Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
NOTE
With AC, Add0.50.3A
With Auto Trans, Add0.80.5A
To Overhaul Cylinder Head, Add
One Bank8.76.2A
To Renew Main Bearings, Add
Without Turbo6.20.0A
With Turbo6.80.0A
To Renew Crankshaft, Add
Without Turbo6.20.0A
With Turbo6.80.0A
To Renew Rocker Arm Assembly, Add
Right Bank0.60.0A
Left Bank
Without Turbo0.90.0A
With Turbo1.00.0A
To Renew Timing Belt, Add
Without Turbo1.50.0A
With Turbo1.60.0A
To Renew Camshaft, Add
Right Bank
Without Turbo
One1.80.0A
Both1.90.0A
With Turbo
One1.90.0A
Both2.00.0A
Left Bank
Without Turbo
One2.00.0A
Both2.10.0A
With Turbo
One2.10.0A
Both2.20.0A
To Clean Oil Pump Screen, Add0.20.0A