Shift Control Solenoid Valve B
SHIFT CONTROL SOLENOID VALVE B (SCSV-B) INSPECTION
1. Disconnect the SCSV-B connector.
2. Measure the resistance between the SCSV-B side connector terminal (4) and the body ground.
Standard value: Approx. 22 ohms [at 20°C (68°F)]
3. If the resistance is outside the standard value, replace the solenoid valve assembly.