Shift Control Solenoid Valve A
SHIFT CONTROL SOLENOID VALVE A (SCSV-A) INSPECTION
1. Disconnect the SCSV-A connector.
2. Measure the resistance between the SCSV-A side connector terminal (3) and the body ground.
Standard value: Approx. 22 ohms [at 20°C (68°F)]
3. If the resistance is outside the standard value, replace the solenoid valve assembly.