Pre-Programming & After-Programming Checks
PRE-PROGRAMMING CHECKSThere are four situations where problems may occur.
1. During installation.
2. During cellular phone power-up initialization.
3. During programming.
4. During use.
Above is a flow chart that should be used AFTER installation of the cellular phone system and BEFORE programming the unit.
Technician Programming Worksheets
AFTER-PROGRAMMING CHECKS
"CHECK" CODE DIAGNOSIS
Each time the cellular telephone is turned "ON", it performs a self-test. If the display shows any "CHECK" codes on its LCD display, refer to the applicable trouble condition.
Check List