Curiosii for ever!: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All10.17.2Includes: R&R Cylinder Head, Oil Pan & Plastigauge Bearings.
Note
With Ac, Add1.00.7A
With Auto Trans, Add0.80.5A
With Ps, Add0.70.4A
With E.C.S., Add0.40.2A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew4.90.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew4.90.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Belt, Renew
Belt A0.90.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Belt B1.00.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.50.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump Screen, Clean0.20.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Rear Main Oil Seal, Renew
Manual Trans2.00.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Auto Trans2.20.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.50.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.