| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| All Cylinders | 14.7 | 10.5 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| One Cylinder |
| Right Bank | 9.8 | 7.1 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| Left Bank | 9.4 | 7.3 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| Both Banks | 11.8 | 8.3 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| NOTE |
| To R&R Connecting Rod Bearings, Add |
| Each | 0.1 | 0.0 | A | |
| To R&R Piston, Pin or Connecting Rod, Add |
| One | 0.2 | 0.0 | A | |
| Each Additional | 0.1 | 0.0 | A | |
| All | 0.9 | 0.0 | A | |
| To Grind Valves, Add |
| One Bank | 2.6 | 2.3 | A | |
| Both Banks | 5.0 | 4.4 | A | |
| With Cruise Control, Add | 0.1 | 0.0 | A | |
| Spark Plugs, Add | 0.6 | 0.0 | A | |