Procedures
EVAPORATIVE CHAMBER INSPECTION [LF]
1. Remove the evaporative chamber. Removal and Replacement
2. Blow from port A and verify that there is airflow from port B.
- If not as specified, replace the evaporative chamber. (See Removal and Replacement)