| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 11.3 | 8.1 | A | Includes: R&R Cylinder Head & Oil Pan. Hone Cylinders & Plastigauge Bearings. |
| Add Following Operations If Performed With Pstn & Ring Jobs |
| Crankshaft, Renew |
| Manual Trans | 6.7 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Auto Trans | 6.9 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Main Bearings, Renew |
| Manual Trans | 6.7 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Auto Trans | 6.9 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Oil Pump, Renew | 1.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Belts. Renew | 0.6 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Note |
| With Ac, Add | 0.7 | 0.4 | A | |
| With Ps, Add | 0.4 | 0.2 | A | |
| With Turbo, Add | 1.0 | 0.7 | A | |