Steering: Service Precautions
06-10 GENERAL PROCEDURESSTEERING PRECAUTION
Wheels and Tires Removal / Installation Note
Tightening torque 135 Nm {13.8 kgf-cm, 100 ft. lbs.}
Power Steering Components Removal / Installation Note
If any power steering fluid line has been disconnected anytime during the procedure, add ATF M-III or equivalent (e.g. MERCON(R)), bleed the fluid lines, and inspect for leakage after the procedure has been completed.
Connectors Disconnection / Connection Note
Disconnect the negative battery cable before doing an, work that requires handling of connectors. Connect the negative battery cable only after the work is completed.