| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 11.5 | 8.2 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigauge Bearings. |
| Add Following Operations If Performed With Pstn & Ring Jobs |
| Main Bearings, Renew |
| Manual Trans | 6.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Auto Trans | 6.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew |
| Manual Trans | 6.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Auto Trans | 6.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Oil Pump, Renew | 0.8 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Chain, Renew | 2.8 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |