Installation
METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Attach the 2 claws to install the rheostat.
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY Installation
3. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH Installation
4. INSTALL NO. 1 SWITCH HOLE BASE Installation
5. INSTALL INSTRUMENT SIDE PANEL LH Installation
6. ENABLE AUTOAWAY/RETURN FUNCTION
(a) Reset the Autoaway/Return function setting to the previous condition by changing the customize parameter Repair Instruction - Customize Parameters.