Reassembly
REASSEMBLY
1. Grease the tube (B) and install the lever (A) by tightening the bolt (C).
TORQUE: 8-12 Nm (80 - 120 kgf.cm, 5.8 - 8.7 lb-ft)
2. Install the lever assembly (B) by tightening the bolt (A).
TORQUE: 8-12 Nm (80 - 120 kgf.cm, 5.8 - 8.7 lb-ft)
3. Install the solenoid (B) and solenoid lever (A).
4. Install the switch assembly (A) and 'P' position switch assembly.
TORQUE: 1.3 - 1.9 Nm (13 - 19 kgf.cm, 0.95 - 1.38 lb-ft)
5. Connect the solenoid connector (A) and install the indicator panel (B).
6. Install the shift lever knob (A) by tightening the two screws.
TORQUE: 2-3 Nm (20 - 30 kgf.cm, 1.45 - 2.18 lb-ft)
7. Install both sides of the brackets.
TORQUE: 16 - 23 Nm (160 - 230 kgf.cm, 11.6 - 16.7 lb-ft)
8. Install the adjusting pedal relay (A) to the bracket.