A/T Shift Lock Solenoid (M25)
A/T SHIFT LOCK SOLENOID1. Remove the solenoid connector.
2. Using an ohmmeter, measure the resistance between terminals.
Standard resistance: 12 - 16 Ohms
3. Attach the positive (+) lead from the battery to terminal #9. and the negative (-) lead to terminal #8.
4. Check that an operation noise can be heard from the solenoid.