| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One Cylinder, Both Banks | 14.2 | 10.0 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| All Cylinders | 16.3 | 11.9 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| One Cylinder | 13.7 | 9.6 | A | Includes: Remove Cylinder Top Ridge, Deglaze Cylinder Walls And Clean Carbon. |
| NOTE |
| With AC, Add | 0.3 | 0.2 | A | |
| To Grind Valves, Add | 4.3 | 0.0 | A | |
| To Renew Connecting Rod Bearings, Add |
| Each | 0.1 | 0.0 | A | |
| To Renew Main Bearings, Add | 2.3 | 0.0 | A | |
| To Renew Piston, Pin or Connecting Rod, Add |
| One | 0.2 | 0.0 | A | |
| Each Additional | 0.1 | 0.0 | A | |
| All | 0.9 | 0.0 | A | |
| To Renew Spark Plugs, Add | 0.3 | 0.0 | A | |