Valve: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Resurface/Grind | ||||
| Left Bank | 6.6 | 4.8 | A | Includes: R&I Cylinder Heads And Make All Necessary Adjustments. |
| Both Banks | 10.8 | 7.5 | A | Includes: R&I Cylinder Heads And Make All Necessary Adjustments. |
| Right Bank | 7.3 | 5.1 | A | Includes: R&I Cylinder Heads And Make All Necessary Adjustments. |
| NOTE | ||||
| To Knurl Valve Guide, Add | ||||
| One | 0.1 | 0.0 | A | |
| To Renew Valve Guide, Add | ||||
| One | 0.2 | 0.0 | A | |
| To Ream Guide, Add | 0.1 | 0.0 | A | |
| With AC, Add | 1.1 | 0.8 | A | |
| To R&R Lifters, Add | ||||
| Each | 0.2 | 0.0 | A |