| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Manual Trans |
| One | 10.9 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan. Hone Cylinder Walls And Plastigage Bearings. |
| One, Both Banks | 13.2 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan. Hone Cylinder Walls And Plastigage Bearings. |
| All | 17.6 | 0.0 | A | Includes: R&R Cylinder Heads & Oil Pan. Hone Cylinder Walls And Plastigage Bearings. |
| Note |
| With AC, Add | 0.5 | 0.0 | A | |
| Auto Trans |
| One | 11.1 | 0.0 | A | |
| One, Both Banks | 13.3 | 0.0 | A | |
| All | 17.8 | 0.0 | A | |
| Note |
| With AC, Add | 0.5 | 0.0 | A | |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew |
| Manual Trans |
| Without AC | 3.9 | 0.0 | A | |
| With AC | 4.0 | 0.0 | A | |
| Auto Trans |
| Without AC | 4.0 | 0.0 | A | |
| With AC | 4.2 | 0.0 | A | |
| Crankshaft, Renew |
| Manual Trans | 4.3 | 0.0 | A | |
| Auto Trans | 4.5 | 0.0 | A | |
| Oil Pump, Renew | 1.9 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.1 | 0.0 | A | |
| Timing Gears, Renew | 2.4 | 0.0 | A | |
| Tune-Up | 0.6 | 0.0 | A | |