Curiosii for ever!: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder7.80.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional1.00.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew3.50.0A
Crankshaft, Renew3.50.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.70.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.50.0A
Timing Belt, Renew0.80.0A
Valves, Grind
    See Valves Grind Head Removed And Combinations.
Tune-Up0.50.0A