Blower Motor Resistor Replacement
REMOVAL PROCEDURECAUTION: Refer to Battery Disconnect Caution in Service Precautions.
1. Disconnect the negative battery cable.
2. Roll back the instrument panel. Refer to Compartment Replacement - IP in Instrument Panel,Gauges and Console.
3. Remove the plenum tray.
4. Disconnect the electrical connectors, as necessary.
5. Remove the screws (1).
6. Remove the blower motor resistor (2).
INSTALLATION PROCEDURE
1. Install the blower motor resistor (2).
NOTE: Refer to Fastener Notice in Service Precautions.
2. Install the screws (1).
Tighten
Tighten the screws to 1.4 N.m (12 lb in).
3. Connect the electrical connectors.
4. Install the plenum tray.
5. Roll forward the instrument panel.
6. Connect the negative battery cable.
7. Test the circuit operation.