Curiosii for ever!: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Without Balance Shaft
Each Additional0.80.5AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.40.2A
With PS, Add0.20.1A
With Auto Trans, Add0.20.1A
To Grind Valves, Add2.82.0A
One CYL
Right Bank10.67.6AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank10.67.6AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks11.58.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank12.08.6AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank12.08.6AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks13.99.9AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew3.00.0A
Crankshaft, Renew4.10.0A
Oil Pump, Renew2.50.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain, Renew2.70.0A
Tune-Up0.60.0A