| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Without Balance Shaft |
| One CYL |
| Right Bank | 8.4 | 6.0 | A | Includes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Left Bank | 8.3 | 5.9 | A | Includes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Both Banks | 12.2 | 8.7 | A | Includes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Note |
| With AC, Add | 0.4 | 0.2 | A | |
| With A.I.R., Add |
| Right Bank | 0.5 | 0.3 | A | |
| Left Bank | 0.4 | 0.2 | A | |
| Both Banks | 0.7 | 0.4 | A | |
| With Skid Plate, Add | 0.4 | 0.2 | A | |
| To Grind Valves, Add | 2.8 | 2.0 | A | |
| All Cyls |
| Right Bank | 9.8 | 7.0 | A | |
| Left Bank | 9.7 | 6.9 | A | |
| Both Banks | 14.8 | 10.6 | A | |
| Note |
| With AC, Add | 0.4 | 0.2 | A | |
| With A.I.R., Add |
| Right Bank | 0.5 | 0.3 | A | |
| Left Bank | 0.4 | 0.2 | A | |
| Both Banks | 0.7 | 0.4 | A | |
| With Skid Plate, Add | 0.4 | 0.2 | A | |
| To Grind Valves, Add | 2.8 | 2.0 | A | |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.1 | 0.0 | A | |
| Crankshaft, Renew | 3.5 | 0.0 | A | |
| Oil Pump, Renew | 0.6 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Timing Chain, Renew | 1.1 | 0.0 | A | |
| Tune-Up | 0.6 | 0.0 | A | |